工程业绩
Rotary kiln Project performanc
| Serial number | User | Treatment capacity | Acceptance situation | Construction time | Substances treated |
| 1 | Ruyuan Dongyang Photoelectrochemical Plant | 2500t/a | Under construction | 2019 | Waste alumina pellets and sludge |
| 2 | Taixing Jinjiang Chemical Industry Co., Ltd. | 8t/d | Oven | 2018 | Sludge, waste liquid and methane |
| 3 | Shandong Ruifeng Polymer Materials Co., Ltd. | 250kg/h | Accepted and put into production | 2018 | Hazardous waste |
| 4 | Jiayue Chemical Products Co., Ltd., Fengnan District, Tangshan City | 1t/h | Accepted and put into production | 2018 | Solid waste |
| 5 | Jingtai Environmental Protection Technology Co., Ltd. | 4t/h | Installation completed | 2017 | Waste salt |
| 6 | Shandong Hongxin Chemical Co., Ltd. | 260kg/h | Accepted and put into production | 2016 | PA waste residue |
| 7 | CNSG Anhui Red Sifang Co., Ltd. | 1.5t/h | Accepted and put into production | 2016 | Sodium hydrosulfite waste liquid and waste residue |
| 8 | CNSG Anhui Red Sifang Co., Ltd. | 600~800kg/h | Assisting in the renovation and operation of the equipment built by other units | 2015 | Sodium hydrosulfite waste liquid and waste residue |
| 9 | Anhui Renli Environmental Protection Technology Co., Ltd. | 15t/h | Accepted and put into production | 2015 | Waste salt and wastewater |
| 10 | Tangshan Baoxiang Chemical Products Co., Ltd. | 1.5t/h | Accepted and put into production | 2015 | Chemical waste residue and tar |
| 11 | Beifang Jinhua Polyurethane Co., Ltd. | 12t/d | Accepted and put into production | 2014 | TDA residue |
| 12 | Fujian Southeast Electrochemical Co., Ltd. | 29t/d | Accepted and put into production | 2012 | Organic waste residue, organic wastewater and sludge |
| 13 | Shenyang Research Institute of Chemical Industry Co., Ltd. | ¢2000×14000 | Accepted and put into production | 2010 | Waste salt and wastewater |
| 14 | Shenyang Research Institute of Chemical Industry Co., Ltd. (Shandong Luba) | 30t/d | Accepted and put into production | 2010 | Waste salt and wastewater |
| 15 | Renli Environmental Protection Co., Ltd. | 1000kg/h | Accepted and put into production | 2010 | Chemical waste residue |
| 16 | Yinguang Chemical Group Co., Ltd. | 1200kg/h | Accepted and put into production | 2010 | Chemical waste residue and tar |
| 17 | Changlong Chemical Co., Ltd. | 1000kg/h | Accepted and put into production | 2008 | Integrated pesticide waste |
| 18 | Huayang Pesticide Chemical Industry Group Co., Ltd. | 30t/d | Accepted and put into production | 2007 | Organic wastewater and waste residue |
| 19 | Nanchong Refining and Chemical Plant | 200kg/h | Accepted and put into production | 2007 | Refining sludge |
| 20 | Zhongxing Waste Disposal Co., Ltd. | 30t/d | Accepted and put into production | 2007 | Hazardous waste |
| 21 | Yinda Chemical Co., Ltd. | 30t/d | Accepted and put into production | 2008 | TDA residue |
| 22 | Beifang Jinhua Polyurethane Co., Ltd. | 12t/d | Accepted and put into production | 2007 | TDA residue |