| Serial number | User | Treatment capacity | Acceptance situation | Construction time | Substances treated |
| 1 | Jiangxi Chenguang New Materials Co., Ltd. | 120m3/h | Under construction | 2019 | Propylene waste gas |
| 2 | Jiangsu Qiqing Environmental Research Institute Co., Ltd. | 500m3/h | Under installation | 2019 | Waste gas |
| 3 | Zhejiang Rongxing Activated Carbon Co., Ltd. | 12580Nm3/h | Accepted and put into production | 2016 | Activated carbon regeneration waste gas |
| 4 | Jingzhou Hongxiang Chemical Co., Ltd. | 1176Nm3/h | Accepted and put into production | 2015 | Hydrogen combustion system |
| 5 | Far Eastern Industries (Shanghai) Ltd. | 3000 m3/h | Accepted and put into production | 2005 | Waste gas containing methanol and ethanol |
| 6 | Jinshan Petrochemical Co., Ltd. | 5000 m3/h | Accepted and put into production | 2006 | Ethylene glycol process waste gas |
| 7 | Xinglu Chemical Co., Ltd. | 2500 m3/h | Accepted and put into production | 2006 | Acrolein organic waste gas |
| 8 | BASF Chemical Co., Ltd. | 10000 m3/h | Accepted and put into production | 2006 | Starting furnace, organic waste gas |
| 9 | Xinjiang Kailianjie Petroleum and Chemical Co., Ltd. | 80000 m3/h | Accepted and put into production | 2007 | MA waste gas |
| 10 | Yuntianhua Co., Ltd. | 6000kg/h+2000kg/h | Accepted and put into production | 2007 | Organic waste liquid and waste gas |
| 11 | Sanonda Chemical Co., Ltd. | 3000 m3/h | Accepted and put into production | 2008 | Organic waste gas containing chlorine, CH4, NH3, H2, etc. |
| 12 | Lonza Guangzhou Fine Chemical Co., Ltd. | 3000 m3/h | Accepted and put into production | 2008 | Chlorine-containing waste gas and waste liquid |
| 13 | Lanzhou Boshitong Petrochemical Co., Ltd. | 250kg/h | Accepted and put into production | 2008 | C4H8-containing waste gas |
| 14 | Ethylene Glycol Plant of CNPC Jilin Petrochemical Company | 250~400kg/h | Accepted and put into production | 2009 | Glycol waste gas |